Festo Pneumatic IC-8M 3/2-2.0-24 TH Operating Instructions Manual Download Page 3

2. Installation

2. Montage

1.

2.

3.

Gasket 

 is inside Interface card 

1

In view of the possibility of dismantling

at a later date, apertures in the pneuma-

tic multi tube connector   may be

sprayed with silicone.
Screw multi pole socket   and pneu-

matic multi tube connector   into the

3

rack. (Total width 
Cap between     is 5 threaded holes

 from the front.

Snap supporting strip   into the rack.
Snap guide rail @for printed circuit
board   into rack.

4.

Slide Interface card 

into 

 and

screw it to face plate 

IO 

with screws 

5.

Dismantling recess   makes it possible

to raise the Interface card with a screw-
driver.

7.

 befindet 

 in 

face-card 

Fur eventuell 

 Demontage 

nen Bohrungen in der pneumatischen

Vielfachsteckkupplung   mit 

spray 

 

Federleiste   und pneumatische 

fachsteckkupplung   in den 
gruppentrager einschrauben. 

breite 

 Abstand zwischen 

 

5 Gewindelocher   von vorne.
Auflagenleiste 

 in den 

 einschnappen.

Fuhrungsschiene 

 fur die 

 im Baugruppentrager einschnappen.

Interface-card   in   einschieben und

an der Frontplatte 

 mit den 

ben   verschrauben.

Demontageaussparung 

 

das Anheben der Interface-card mit
einem Schraubendreher.

3. Operating modes

3. Betriebsarten

Manually: Only after activating the release
input (MAN ON) for manual operation.

Electrically: Through electric signals (relay,

limit or stop switch, 

With card 14 022, manual operations (MAN
ON) may be selected b switching a 
white miniature switch  on the card from

“non interrupting” to “interrupting”.

Manuell: erst 

 Aktivierung des 

einganges (MAN ON) fur Handbetatigung.

Elektrisch: 

 elektrische 

 Endschalter, 

 der Karte 14 022 ist die Handbetatigung

(MAN ON 

 einen 

 

schalter 

auf der 

 von 

 

 auf 

 umstellbar.

Reviews: