801
9
Terminal Position
Fig. 5
Fig. 3
Minimum Clearance
mm
NOTES
* If a side outlet flue is to be used, a clearance of 75 mm will be needed on the flue outlet side of the boiler.
** Access to the front of the boiler must be available for maintenance (min. 600 mm).