
17
Ferroli F 24 B
Connection with concentric fl ue system
The unit can be connected to a concentric air/flue duct with a wall or rooftop outlet as shown on the
following drawings. Numerous accessories are available on request to meet the various installation
requirements. Please refer to our “flue manual” or the price list.
Horizontal concentric fl ue installation
Horizontal fl ue installation
1.Define the position for installing the unit.
2.If using (1KWMA56W) this must be installed level, for non-standard flue lenghts over im a fall of 3 mm
per metre should be incorporated.
3.Make a hole of diameter 10 - 20 mm greater than the nominal diameter of the concentric pipe used.
4.If necessary, cut the end pipe to size, ensuring that the external pipe protrudes from the wall by between
10 and 60 mm (Fig. 10a and 10b). Remove the cutting burrs.
* = between
10 and 60 mm
Drill the wall 10
÷
20 mm
more than the pipe diameter
010008X0
* = between
10 and 60 mm
Drill the wall 10
÷
20 mm
more than the pipe diameter
95
125
S
50*
125
50*
125
50*
S
D
L
30
95
257
203
L
P
50*
S
100
100
95
30
257
203
30
Install level
Install level
1KWMA56W
Install level
Install level
D
S
95
30
P
203
257
Side view
View from above
fig. 10a
Side Outlet
fig. 10b
Front view
View from above
P = S + 85 mm
Rear Outlet
L = S + D + 242 mm