![ferroamp EnergyHub Wall 14 kW Installation Manual Download Page 12](http://html.mh-extra.com/html/ferroamp/energyhub-wall-14-kw/energyhub-wall-14-kw_installation-manual_2281779012.webp)
10
Attach the mounting plate to a place that meets the criteria
described above. Flatten the side against the wall, see figure
below.
Lift up your EnergyHub and hang it on the intended jumper, the top
of the mounting plate, see figure below. Make sure it sits securely
before letting go.
With the two included locking screws, lock your EnergyHub to the
bottom plate of the mounting plate. Now it's in place!
2.3
Connection to the switchboard
NOTERA!
To calculate the correct cable dimension, use Ferroamp's
cable calculator available on www.ferroamp.se under the support
tab.
Connect the EnergyHub Wall to the building's substation as shown
in the figure below. Secure with B20 fuses for Energyhub 14 kW.
(1)
Main fuse, (
2
) Main circuit breaker, (
3
) distribution cabinet,
(
4
) Fuse for EnergyHub, and
(5)
Circuit breaker for EnergyHub
2.4
AC contact
The five-pole connector should be used to connect the EnergyHub
to the AC network. Proper connection is marked on the
connector. See image below for schematic image:
The picture above shows how the AC cable should be connected,
for orientation of the connector see below.
1,2,3 represents the phases. However, please note that the phase
sequence does not affect the function.
Make sure that the ground and neutral conductor
from the AC network are connected to the correct
positions in the connector. It is recommended to
put an external working switch on the incoming AC
cable in order to easily turn off the system.
Make sure the AC plug is properly plugged in before
energizing the EnergyHub.
Summary of Contents for EnergyHub Wall 14 kW
Page 1: ...EnergyHub Wall 14 kW PD00145 Rev D02 Installation manual Svenska English ...
Page 2: ......
Page 9: ...7 ...
Page 15: ...13 ...
Page 16: ...Electricity Reinvented ...