background image

Summary of Contents for MEGARA 230

Page 1: ...No Instrucciones Instructions LIFTING TOWERS Fabricante Manufacturer FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fe...

Page 2: ...FENIX STAGE S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain...

Page 3: ...bility the conformity of the product Name Model Description to which this declaration refers as per the following regulations CE 2006 42 EG Person empowered to compile the technical file and authorise...

Page 4: ...sions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusiones Conclusions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusio...

Page 5: ...unto 3 p g 8 seguir las instrucciones de uso ver punto 4 p g 9 un manteniminto peri dico ver punto 5 p g 10 conocer los sistemas de prevenci n ver punto 7 p g 11 BGV C1 is a regulation for staging and...

Page 6: ...E SEGURIDAD 8 4 INSTRUCCIONES DE USO 9 5 MANTENIMIENTO 10 6 RIESGOS ESPEC FICOS 10 7 SISTEMAS DE PREVENCI N 11 INDEX 1 INTRODUCTION 12 2 GENERAL DATA 12 2 1 Technical data 12 2 2 Applicable regulation...

Page 7: ...nicos Denominaci n TORRE ELEVADORA Modelo MEGARA 230 Caracter sticas t cnicas Altura m xima 5 30m Altura m nima 1 82m Carga m xima 230kg Carga m nima 25kg Material Acero seg n EN 10305 5 rea de la bas...

Page 8: ...po de trabajo Tenga cuidado con todo tipo de salientes por encima de la torre elevadora como cornisas balcones letreros luminosos etc Es muy importante evitar la presencia de cables por debajo de la a...

Page 9: ...gar a la altura deseada En el caso de que el gatillo est duro y sea dif cil de sacar hay que realizar un peque o juego con el cabestrante hasta encontrar la posici n exacta donde se libere el gatillo...

Page 10: ...e su territorio 6 RIESGOS ESPEC FICOS Fallo del sistema de freno Puede producirse por deficiencias en el siste ma de frenado o por una mala instalaci n Si deja de funcionar puede provocar un riesgo im...

Page 11: ...las torres de forma segura Sobre ca da de objetos a distinto nivel golpes y o contusiones con objetos El riesgo de ca da de objetos a distinto nivel puede prevenirse con la utilizaci n de elementos d...

Page 12: ...MEGARA 230 Technical characteristics Maximum height 5 30m Minimum height 1 82m Maximum load 230kg Minimum load 25kg Material Steel EN 10305 5 Open base area 2 x 2m Closed base area 0 47 x 0 47m Weight...

Page 13: ...r element which might move Never use a ladder over the lifting tower or lean against it for any kind of work Beware of any kind of projection above the lifting tower like cornices balconies luminous s...

Page 14: ...se the pin is hard to pull out a small number of move ments should be made with the winch until founding the right position where the pin is released and can be pulled out comforta bly Under no circum...

Page 15: ...urer or an authorised distributor within your territory 6 SPECIFIC RISKS Braking system failure May occur due to braking system deficien cies or bad installation If it stops working it could cause a s...

Page 16: ...a different level knocks and or contusions with objects The risk of objects falling to a different level can be prevented by using homologated safety elements e g a safety pin which fixes the inner pr...

Page 17: ...17...

Page 18: ...18...

Page 19: ...19...

Page 20: ...20...

Page 21: ...21 NOTAS NOTES LIFTING TOWERS...

Page 22: ...22 NOTAS NOTES LIFTING TOWERS...

Page 23: ...23 NOTAS NOTES LIFTING TOWERS...

Page 24: ...FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixstage com www fenixstage com www fenixstage com...

Reviews: