Installation instructions
Installation, electrical connection and the first commissioning
is permitted to be performed by a worker with relevant
qualifications. The panels are intended for mounting on a wall
or ceiling. The producer must be consulted before any other
form of installation is attempted.
Installation on the ceiling
• Position the ceiling mounting fr
ame in the location where
the panel is to be placed, using a pen, mark holes according
to the holes on the frame.
•
Drill the holes, insert the wall anchors and attach the
mounting frame with the screws.
•
Always hang the panel by all mounting slots!
•
Slide the panel into the mounting frame and
secure it using
the enclosed screw (Fig. 7)!
Installation on the wall
•
Mark the holes according to the table, drill out the holes,
insert the dowels and drive the screw in to protrude approx.
5 mm. (Fig. 8)
•
Always hang the panel by all mounting slots!
•
Put the panel on the screws.
Clearance distances
The distance between the bottom edge of the appliance and
the floor mustn’t be less than
50 mm; 150 mm is
recommended. The clearance distance on the side (e.g. from
furniture) must be at least 50 mm, and 50 mm is the minimum
in the upward direction (see Fig. 5). There must be at least 50
cm of free space in front of the panel. The connection of the
heater in wet conditions (bath, shower, toilet etc.) must
comply with the general safety requirements and technical
standards according to VDE 0100 / T701. Fixed installation
according to Fig. 4 in area 2 possible, mounting with plug only
permitted from area 3 onwards. The attached plug has a
lower protection class than the heater. The panel is a class II
appliance, with IP 44 coverage. The panel must not be placed directly under
an electric socket.
Fig.7
Fig.8 ECOSUN 850 GS only
Fig. 4
Fig. 5
Fig. 6