Feit Electric PATH/SYNC/SOL/BZ/2 Use And Care Manual Download Page 4

4

WWW.FEIT.COM

Backplate Screw Installation

 Installing the backplate

□ 

Position the backplate (EE) in the desired location. Utilize  

  the holes on the backplate (EE) to mark the location for   

  the wall anchors (FF).

1

 Peeling off the protective film

□ 

Peel off the protective film from one side of the  

 

  double-sided adhesive (HH).

1

 Attaching the double-sided tape

□ 

Attach the double-sided adhesive (HH) to the backplate   

  (EE). Peel off the other side of the double-sided 

  adhesive (HH).

2

 Drilling the holes

□ 

Use a power drill to pierce two holes in the marked    

  locations and insert the wall anchors (FF).

2

 Attaching the backplate

□ 

Align the backplate (EE) holes with the wall anchors (FF) and insert the screws (GG) using a Phillips screwdriver.

3

 Pressing the backplate onto the surface

□ 

Position the backplate (EE) to the desired area. Press the backplate (EE) onto the surface and hold for 30 seconds to assure the    

  backplate (EE) is held securely.

3

EE

FF

Backplate Adhesive Installation

EE

GG

FF

FF

HH

EE

EE

THIS SIDE UP

THIS SIDE UP

HH

HH

Wipe down surface before installation.  
For best results only install on smooth, clean surfaces.

Summary of Contents for PATH/SYNC/SOL/BZ/2

Page 1: ...gned to enhance your home Visit us online to see our full line of products available for your home improvement needs Thank you for choosing Feit Electric Questions problems missing parts Before return...

Page 2: ...ion is subject to the following two conditions 1 This device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired...

Page 3: ...3 WWW FEIT COM CC DD EE FF GG HH II Power drill 7 32 in Drill Bit Part Description Quantity AA 12 in Pole LED Pathway Light 2 2 BB Ground Stake 2 CC Remote Control 1 DD EE Remote Backplate 1 FF Anchor...

Page 4: ...d adhesive HH 2 Drilling the holes Use a power drill to pierce two holes in the marked locations and insert the wall anchors FF 2 Attaching the backplate Align the backplate EE holes with the wall anc...

Page 5: ...ing tab 3 5 Operation without Remote Turning on the fixture Turn the on the pathway light AA by pressing the button located on the base below the light 1 This OneSync fixture works on its own or with...

Page 6: ...le Brightness Level Selectable White Color Cycle Set Daily Timer DD II OneSync Remote 1 2 3 4 5 6 2hr 4hr 8hr Timer Reset Groups LOW HIGH RGB Replacing the pathway light battery To replace the recharg...

Page 7: ...n button on the OneSync device for 10 seconds It will flash to indicate that all groups have been unpaired from the device 3 NOTE The OneSync remote is compatible with PATH SYNC SOL BZ PATH SYNC SOL N...

Page 8: ...Remote to Smart Bridge 1 On the remote select the group number you wish to transfer 2 Press and hold the Colors Cycle button for 2 seconds 3 The fixtures in the group will slowly blink once to indicat...

Page 9: ...FEIT ELECTRIC COMPANY PICO RIVERA CA www feit com Questions problems missing parts Before returning to store visit feit com help for further assistance...

Reviews: