Feina SF70-1EH Quick Start Manual Download Page 3

 
 
Of course, is not necessary that  blocks will be parallelepipeds , can be left as spilled by 
the mixer. 
  
  
Then, at the central leg, also is necesary pours a least 100 kg of concrete, to be sure than 
the follower does not move laterally. The leg may be buried in the concrete. 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
The accuracy  mounting the beams and the trackers is not much necesary, but should 
take care that the maximum angle betwen bars who forms the follower axis should be 
not more than 0.7 º. This means that the 6 meters of length of each bar can go up or 
down (or turn off to the right or left) and vary about 73 mm from the perfect alignment . 

Reviews: