PLAN AHEAD

Site Selection

l

Avoid  overhanging  trees  as  much  as  possible  as  leaves  will  make  regular  cleaning

necessary and broken branches are a potential hazard.

l

Small trees,bushes or fences nearby can be helpful,acting as a wind break.

Site Preparation

The  site  must  be prepared  so  that the base of  the  shed  is  level  all  round  and checking
with a spirit level is required.

The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.

The shed is not designed to be built onto lawn directly

.

Also the

ground will get muddy during rainy days.

If  a  concrete  pad  is  made,it  is  important  that  this  slopes  towards  the  edges  to  prevent

water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.

Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.

The  bricks or blocks  should be  cemented  onto  firm and  level  concrete  footings  and the
greenhouse frame drilled and screwed to the base.

IMPORTANT NOTES:

l

Find  someone  to  help  you:it  is  much  easier  with  someone  to  hold  parts,pass  tools

ect.Also  some  steps  require  two  people  to  lift  structures  together.This  is  not  very

heavy work so would suit most able-bodied people.

l

Allow  plenty  of  time:rushing  often  causes  errors  and  the  re-doing  of  incorrect

assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.

l

Have the right tools to hand.

l

Safety clothing as recommended in the 'Tools' section.

l

Ideally  lat  out  the  parts  and  check  that  all  are  present  before  commencing

construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.

l

Tighten  all  nuts  carefully,being  sure  not  to  miss  any.Check  the  frame  is  square  and

using a spirit level to check that it is upright.

Summary of Contents for FAJ700A

Page 1: ...MANUAL Instructions for Assembly Requires two people and takes 1 1 5 hours for lnstallation Quick Easy Assembly Ridge Reinforced Walls Available in Various Sizes FAJ700A FEIDER 32 Impasse Aristide Be...

Page 2: ...parts for the building Separate contents of the carton by the part number while reviewing parts list Familiarize yourself with the hardware and fasteners for easier use during construction These are...

Page 3: ...ucted from bricks blocks or mounted on a concrete pad The bricks or blocks should be cemented onto firm and level concrete footings and the greenhouse frame drilled and screwed to the base IMPORTANT N...

Page 4: ...2 B3 B4 1490mm 1169mm 1169mm 809mm 809mm 1560mm 1560mm 818mm 876mm 1105mm 1105mm 1436mm 1118mm 1118mm 1436mm 356mm 1494mm 1494mm 876mm 876mm 1565mm 1207mm 1207mm 432mm 876mm 139mm 139mm 286mm 286mm 2...

Page 5: ...0mm PART NO Qty G2 4 2 GD GB GC 4 F1 F2 F3 S3 460 8 75 432 S2 366 PART NO Qty 1550X432mm D1 1 D2 1 4 P1 P9 P4 P10 P11 P7 1207mm 2 2 4 2 2 10 P3 15 GE 2 1207mm 1207mm 1550X432mm 1560mm 1560mm 1560mm GF...

Page 6: ...1L 1L 2L 2R 3L 3R 5 7 8 P1 P1 P4 P4 P4 P4 D1 D2 18 6 4R 4L 11 9 10L 10R P3 P3 P3 P3 15 20 P10 P11 P3 P9 P9 13 14 16 1 16 13 14 21R 21L 21L 21R 12 B1 B3 B4 B2 12 B1 B3 B4 B2 19 P7 P7 P7 P7 P7 P7 P7 P7...

Page 7: ...2L 2R 1R 1L F1 F1 7 1L PART NO Qty 2 F1 1L 1R 1R 2 2L PART NO Qty 1 F1 2R 2L 2R 1 1L 1R x2...

Page 8: ...T NO Qty 1 1 3L 3R 3L 3R F1 F1 PART NO Qty 1 5 5 F1 F1 1 When diagonal measurements are equal the frame is square 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly...

Page 9: ...PART NO Qty P9 1 F1 S3 1 9 F1 S3 P4 F2 S3 PART NO Qty P3 1 F1 S3 P3 P4 P9 5 5 5 22R PART NO Qty 22R 1 S3 F1...

Page 10: ...PART NO Qty 1 P4 P4 F1 S3 F1 S3 5 10 S3 F1 22R 23R 22L F1 PART NO Qty 22L 1 23R PART NO Qty 23R 1 S3 F1 F1...

Page 11: ...PART NO Qty P3 1 F1 S3 PART NO Qty 1 P4 F1 S3 F1 S3 P4 P3 5 5 11 PART NO Qty S3 F1 23L 1 23L F1...

Page 12: ...PART NO Qty P9 1 1 P4 F1 S3 F1 S3 F2 S3 P4 P9 5 PART NO Qty 22R 1 12 S3 F1 F1 22R 22R 23L 5 PART NO Qty 22L 1 F1 S3 F1...

Page 13: ...F1 PART NO Qty 2 9 2 11 PART NO Qty PART NO Qty 2 2 21L 21R 2 2 B3 B4 2 2 B1 B2 2 12 x2 21L 21R B4 B3 B1 B2 12 12 B3 21L 13 F1 S3 F2 S3 PART NO Qty 2 P1 P1 P1 F2 S3 9 11 5 9 11...

Page 14: ...14 10L 10R PART NO Qty 1 10L 1 10R 7 8 PART NO Qty 1 7 1 8 G2 4 7 8 G2 F1 S3 x2 PART NO Qty GF 4 GF GF F2 S3 8 7 G2 10L 10R F1 S3...

Page 15: ...PART NO Qty 1 16 1 16 1 F2 PART NO Qty P3 13 PART NO Qty 2 2 13 14 13 14 F2 x2 F1 S3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 15...

Page 16: ...16 16 1 F2 12 F2 12 4L 4R 6 PART NO Qty 1 4L 1 4R 1 6 F1 S3 14 13 13 14 F2 F2 F1 F2 F2 16 6 4R...

Page 17: ...PART NO Qty 1 P10 P11 1 F1 S3 F1 S3 F1 S3 17 PART NO Qty 10 P7 PART NO Qty 1 P10 P11 1 P11 P10 P10 P11 P7 P7...

Page 18: ...PART NO Qty 19 2 F1 S3 PART NO Qty 2 17L 17R 2 F1 GE 17R 20 17L F1 17R GC F1 15 1 24 1 24 1 PART NO Qty 15 1 15 2 17R 17R 17L 17L GE GE 2 GE 15 1 15 2 15 15 1 GC GC GC GC 4 GC 2 15 15 2 15 20 1 20 18...

Page 19: ...19 PART NO Qty GD 4 D1 D2 GE S3 F2 PART NO Qty 6 18 D1 D2 18 18 18 S3 F1 F2 x2 S3 F2 PART NO Qty D1 1 D2 1 2 GB x2 GB F2 D1 D2...

Page 20: ...20 F3 7 8 G2 D1 D2...

Page 21: ...Metal Garden Shed Instructions for Assembly Metal Garden Shed Foundation Kit Instructions for Assembly Size SD YX108...

Page 22: ...PART NO Qty W1 W2 W3 716mm 4 8 12 1175 5mm 1152mm F1 20 W1 1L W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2 W2 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W2 W2 W1 W2 W1 W1...

Reviews: