![Feel Good CAGE 6M Instructions Manual Download Page 4](http://html1.mh-extra.com/html/feel-good/cage-6m/cage-6m_instructions-manual_3821710004.webp)
SET UP AS BELOW ILLUSTRATION
STEP I – The roof components are to be built first, poles 4 make up the sloped sides running front to back, with poles 5 and 5a making up the central, flat horizontal row, poles 1 run from
front to back like below diagram.
Lay all roof parts on the floor and connect like below with part 14 and 15
Page 4 of 6