Feel Good CAGE 6M Instructions Manual Download Page 4

 

 

SET UP AS BELOW ILLUSTRATION 

 

STEP I – The roof components are to be built first, poles 4 make up the sloped sides running front to back, with poles 5 and 5a making up the central, flat horizontal row, poles 1 run from 

front to back like below diagram. 

 

Lay all roof parts on the floor and connect like below with part 14 and 15 

 

Page 4 of 6 

Reviews: