Fedders C1018BBD Installation, Operation And Maintenance Manual Download Page 1

REV. 9/22/04

23-23-0418N-003

Installation, Operation and Maintenance

MODEL C10 & C12 SERIES — 1.5 THRU 5 TON

Split System High Efficiency

Air Conditioner

Summary of Contents for C1018BBD

Page 1: ...REV 9 22 04 23 23 0418N 003 Installation Operation and Maintenance MODEL C10 C12 SERIES 1 5 THRU 5 TON Split System High Efficiency Air Conditioner...

Page 2: ...is inspection is completed NOTES TO INSTALLER The words SHALL and MUST indicate a requirement which is essential to satisfactory and safe product performance The words SHOULD and MAY indicate a recomm...

Page 3: ...vaporator Consider the following factors 1 The air inlet SHALL be located at least 12 from a wall or other obstruction for unrestricted air flow 2 The air outlet SHALL be located so as to direct disch...

Page 4: ...sweat type copper connecting fittings COPPER SUCTION LIQUID LINES 1 Remove the valve core from the schrader port Wrap a wet rag around the copper stub Flux the joint and braze with silphos rod contai...

Page 5: ...ED BY A QUALIFIED LICENSED ELECTRICIAN IMPROPER ELECTRICAL HOOK UP MAY DAMAGE EQUIPMENT CAN CREATE A HAZARD CAUSE PERSONAL INJURY OR DEATH AND WILL VOID THE WARRANTY 5 When replacing an existing syste...

Page 6: ...occurs on the 12 F 6 7 C superheat line ADD CHARGE to obtain 12 F 6 7 C superheat INSTRUCTIONS 1 Measure suction pressure and determine evaporator refrigerant temperature on R 22 scale of low side gau...

Page 7: ...1 115 C F LINE LIMIT DO NOT ADD CHARGE IF POINT FALLS BELOW THIS LINE Chart based on 350 to 400 CFM ton indoor airflow and 50 relative humidity use on systems that cool with fixed restrictor OUTDOOR T...

Page 8: ...ARIATION FROM CHART FOR 3 8 AND 11 8 LINE SET CONDENSER MODEL NUMBER AIR HANDLER MODEL NUMBER COIL MODEL NUMBER Included with Air Handler Depending on match ups the indoor piston may need to be change...

Reviews: