- 14 -
INF-TN1FSH-E
3. INSTALLATION AND BEFORE START OF
OPERATION
3.1. Before operation
(1) Selection of installation location of flow transmitter and detector
(2) Installation and wiring of flow transmitter
(3) Power ON
Check the power supply specifications and wiring before turning on the power.
(4) Entering of piping parameters and calculation of the sensor spacing (*Check the sensor spacing if parameter setting
is provided.)
(5) Mounting of frame to measurement piping (*When using a frame for mounting)
(6) Mounting of sensor unit
Be careful not to mount the unit with wrong dimension.
(7) Setting of measurement range (*Not required if measurement range is specified by parameter setting provided.)
(8) Zero point adjustment
Before performing zero point adjustment, check that the pipe is filled with fluid, the fluid is in still state, and that
the measurement status is normal.
(9) Start of measurement
3.3.
Flow transmitter wiring
3.1.
Before operation
3.4.2.
Entering piping specifications
4.4.1.
Measurement method and sensor
3.4.2.
Entering piping specifications
3.5.
Installing detector
6.3.
Checking received waveform
Chapter 6. TROUBLESHOOTING
3.7.
Zero adjustment
Output specification setting
System setting
Total specification setting
Total alarm setting
Measurement display specification setting
Dumping setting
Low flow rate cut setting
Output correction setting
Status output setting
8.5.
Composition of key operation
Measurement
Chapter 5. MAINTENANCE AND INSPECTION