
NUMBER
GS-20-0454
TYPE
APPLICATION SPECIFICATION
TITLE
PAGE
REVISION
OCTIS PLUG KIT ASSEMBLY
– HYBRID, SIGNAL & POWER
15 of 30
D
AUTHORIZED BY
DATE
Stalin Alosius
2019-09-12
CLASSIFICATION
UNRESTRICTED
Copyright FCI
Form E-3334
Rev F
Form E-3334
Rev F
10 APPLICATION PROCEDURE
10.1
Cable Preparation for Power Profile Contact
Step 1
Strip the outer jacket. (Fig 9)
Do not cut any wire on braid
Figure 9
Step 2
Unweave and fold back the braid (Fig 10)
The braid should be equally distributed
No Bundles
Figure 10
Step 3
Cut the braid to 9mm (Fig 11)
Figure 11
PDS: Rev :D
STATUS:Released
Printed: Sep 18, 2019