FCI
Manual Part No. 166813-001
Issued: Date (11/16/95)
Page 3 of 6
Rev. 10/02/01 ECR V10357
Revision B
K\DCU\Manuals
Operation
Crimping Instructions
To Load Terminal:
1. Press terminal holder as shown in Figure 1.
2. Insert terminal with “U” shaped barrels up, onto terminal holder pin until terminal is against pin
shoulder.
When using wire with regular insulation, place terminal in side marked “A”.
When using wire with coax insulation, place terminal in side marked “B”.
3. Release terminal holder:
Hold terminal against pin shoulder while releasing holder to insure terminal remains in proper position
while moving over anvil.
To Load Wire:
1. Place wire, stripped to proper length, into barrel of terminal –or-
2. Wire tonker can be used for wire stop by placing stripped end of insulation against tonker.
Crimp by holding wire and closing hand tool.
NOTE:
To eliminate a sticking problem, the top dies should be cleared of gold build-up at
approximately 125 crimps
Figure 1
PDM: Rev:B Released .
STATUS: Printed: May 10, 2010