38
Step 10: Nose Gear Steering & Joining the Fuselage Nose Section
Installation of equipment is up to the builder’s discretion as many options exist. The factory
supplied position of the steering servo was in the front equipment tray; however this location
proved to increase the amount of servo torque required for steering, it was decided to fabricate
a new servo mount to position the steering cables in a straight line from the tiller arm, The new
mount was placed into the nose section, see photo 75.
Fabricate the servo mount/battery holder as per photos 76 through 80.
Inspect all the nose mounting holes in the fuselage to insure they are free from debris. Try
the bolts and make sure they all thread easily.
Position the nose section and using the supplied bolts and washers, bolt the two main
bulkheads together.
Photo 75
Airline Connections
Photo 74
Summary of Contents for FEI BAO
Page 20: ...20 Photo 36 Photo 34 Photo 35 ...
Page 27: ...27 Photo 49 Photo 51 Photo 50 ...
Page 28: ...28 Photo 52 Photo 53 Photo 54 ...
Page 29: ...29 Photo 56 Photo 55 Spacer ...
Page 31: ...31 Photo 59 Photo 58 Photo 60 ...
Page 32: ...32 Photo 61 Photo 62 Photo 63 ...
Page 39: ...39 Photo 76 Photo 77 Photo 78 ...
Page 40: ...40 Photo 79 Photo 80 ...
Page 42: ...42 Photo 82 Photo 83 ...
Page 45: ...45 Photo 89 Photo 88 ...
Page 49: ...49 Photo 94 Photo 95 Photo 96 ...
Page 54: ...54 Congratulations you have completed construction of your Fei Bao Rafale ...