22
F80W
Tables of Rated Operations
Every 10 hours at the beginning of work (daily)
3.6.1
Fuel level check
3.6.2
Engine oil level check
3.6.3
Hydraulic tank oil level check
3.6.4
Driver's stand cleaning
3.6.5
Cleaning the hopper, outlets and conveyor
3.6.6
Cleaning the augers
3.6.7
Test of burner ignition, flame position adjustment and spark plug maintenance
3.6.8
Gas equipment tightness check
Every 10 hours at the end of work (daily)
3.6.9
Fuel level check
3.6.10
Cleaning the conveyor
3.6.11
Cleaning the augers
Every 50 hours (weekly)
3.6.12
Clearing the water separator
3.6.13
Machine lubrication
After 50 hours of operation
3.6.17
Engine oil replacement *
Every 100 hours of operation (monthly)
3.6.14
Fuel system tightness check
3.6.15
Rear wheel fastening check
3.6.16
Conveyor chain tension
Every 250 hours of operation (every 3 months)
3.6.17
Engine oil replacement *
3.6.18
Engine air intake check
3.6.19
Hydraulic oil cooler cleaning
3.6.20
Hydraulic circuit tightness check
3.6.21
Battery inspection
3.6.22
Checking the conveyor drive chain tension
Summary of Contents for Dynapac F80W
Page 1: ...SERVICE BOOK Asphalt paver wheeled F80W Hatz 4812077888 ...
Page 2: ......
Page 4: ......
Page 8: ...4 F80W ...
Page 10: ...6 F80W ...
Page 12: ......
Page 14: ......
Page 16: ...12 F80W ...
Page 68: ......
Page 70: ......
Page 72: ......
Page 74: ...70 F80W Notes ...
Page 75: ...71 F80W Service book Notes ...
Page 76: ...72 F80W Notes ...
Page 77: ......
Page 78: ...www dynapac com ...