D 30.18 37
Installation and operation
- Install the bracket (1) at the vehicle step (3) using the corresponding assembly ma-
terial (2).
- Fasten the illuminated balloon (4) to the holding tube (5) and tighten the clamping
bolt (6).
- Guide the holding tube (5) into the premounted holder (1) and tighten the clamping
lever (7) correctly to fix the holding tube.
- With one hand on the handle flagged in green (8), pull down hard to open the bal-
loon before putting it into operation.
When the balloon has been pulled down completely as far as it will go, a safety
brace (9) hinges out of the guide rod.
- Once the illuminated balloon is completely mounted and secured, connect
the plug (10) of the illuminated balloon in the corresponding switch cabinet
sockets (11).
m
Never adjust the holding tube while the illuminated balloon is in operation.
A
Operation of the switch cabinet - see screed operating instructions.
m
Route the supply lines so as to rule out any risk of stumbling or damage to the lines.
Danger due to electric shock
Electric shock can cause severe or fatal injuries
- The Powermoon must always be completely unpacked,
assembled and aligned before it is connected to the
power grid and switched on!
Danger of squeezing!
Fingers or hands can get clamped between the bracket and
the holding tube!
- Caution when inserting the holding tube!
CAUTION
CAUTION
Summary of Contents for Dynapac F1800W
Page 1: ...OPERATION MAINTENANCE Paver Finisher F1800W Type 912 03 1019 4812076574...
Page 2: ...www dynapac com...
Page 24: ...A 2...
Page 32: ...B 8 4 Safety devices 10 7 2 11 2 1 9 12 3 10 8 4 5 6 7...
Page 43: ...B 19 71 70 40 41 42 xxxxxxxxxxxxxxxxx 51 53 73...
Page 58: ...B 34...
Page 84: ...C 12 18 26...
Page 88: ...D 12 18 4 13 14 17 16 18 15 10 12 11...
Page 90: ...D 12 18 6 13 14 17 16 18 15 10 12 11...
Page 92: ...D 12 18 8 13 14 17 16 18 15 10 12 11...
Page 94: ...D 12 18 10 21 20...
Page 96: ...D 12 18 12 23 22...
Page 98: ...D 12 18 14 25 24...
Page 100: ...D 12 18 16 26 27...
Page 102: ...D 12 18 18 28 29...
Page 104: ...D 12 18 20 30 31...
Page 106: ...D 12 18 22 32 33...
Page 108: ...D 12 18 24 34 35...
Page 110: ...D 12 18 26 36 37...
Page 112: ...D 12 18 28 38...
Page 114: ...D 12 18 30 39 40 41 42...
Page 116: ...D 12 18 32 44 43...
Page 118: ...D 12 18 34 45 46 47...
Page 120: ...D 12 18 36 47...
Page 124: ...D 12 18 40 90 91 92 94 93 95 96 96...
Page 126: ...D 12 18 42...
Page 127: ...D 24 18 1 D 24 18 Operating the display...
Page 151: ...D 24 18 25 Example...
Page 154: ...D 24 18 28...
Page 159: ...D 30 18 5 Control platform telescoping seat consoles 10 B A B 11 6 4 5 2 8 A 9 7 12...
Page 189: ...D 30 18 35 Illuminated balloon o 2 3 1 5 4 9 8 11 6 7 10...
Page 197: ...D 42 18 5 1 9 2 5 5 3 4 6 7 8...
Page 199: ...D 42 18 7 1 9 2 5 5 3 4 6 7 8...
Page 202: ...D 42 18 10 1 2 3 4 5 6...
Page 204: ...D 42 18 12 2 3 6 5 7 1...
Page 206: ...D 42 18 14 2 2 3 1 6 5 4...
Page 210: ...D 42 18 18 A 1 3 2 4...
Page 212: ...D 42 18 20 1 2 5 6 7 4 11 10 3 12 9 8...
Page 215: ...D 42 18 23 3 1 2...
Page 217: ...D 42 18 25 1 2 3...
Page 219: ...D 42 18 27 1 3 14 2 15 5 8 4 9 7 6 5 4 11 10 12 13 16...
Page 226: ...D 42 18 34...
Page 243: ...F 30 18 1 F 30 18 Maintenance conveyor 1 Maintenance conveyor...
Page 250: ...F 30 18 8...
Page 251: ...F 40 18 1 F 40 18Maintenance auger assembly 1 Maintenance auger assembly...
Page 275: ...F 60 18 1 F 60 18 Maintenance hydraulic system 1 Maintenance hydraulic system...
Page 291: ...F 71 18 1 F 71 18 Maintenance travel drive steering 1 Maintenance travel drive steering...
Page 302: ...F 71 18 12...
Page 303: ...F 83 18 1 F 83 18 Maintenance electrical system 1 Maintenance electrical system...
Page 318: ...F 83 18 16...
Page 326: ...F 90 18 8...
Page 327: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Page 338: ...F 100 12...
Page 340: ...F 111 18 2 2 6 6 1 7 3 4 5...
Page 346: ...F 111 18 8...
Page 347: ......
Page 348: ...www dynapac com...