![Fayat DYNAPAC DFP8 Operating Instructions And Maintenance Download Page 83](http://html1.mh-extra.com/html/fayat/dynapac-dfp8/dynapac-dfp8_operating-instructions-and-maintenance_3697802083.webp)
4.
Slightly loosen the fastening screws (2) on both sides.
5.
Pull the engine carrier forward, remove and replace the V-
belt (1).
6.
Install the new V-belt and pull the engine carrier back.
7.
Tighten the fastening screws (1) on both sides.
8.
Check tension of V-belt, tighten if necessary.
ð
Compression measurement:
approx. 5 mm (0.2 in).
9.
Assemble the V-belt guard (1) with fastening screws (2).
10.
Check the V-belt tension again after 25 operating hours,
tighten if necessary.
8.8.3.1
Checking the frequency of the base plate
Keep feet and hands clear of the vibrating base plate.
2
B-834-0170
1
Fig. 73
1
B-834-0171
Fig. 74
Fig. 75
B-834-0144
1
2
Fig. 76
Maintenance – Annually
DFP8
83
Summary of Contents for DYNAPAC DFP8
Page 6: ...Table of contents DFP8 6...
Page 7: ...1 Introduction Introduction DFP8 7...
Page 11: ...2 Technical data Technical data DFP8 11...
Page 15: ...3 Concerning your safety Concerning your safety DFP8 15...
Page 39: ...4 Indicators and control elements Indicators and control elements DFP8 39...
Page 45: ...5 Checks prior to start up Checks prior to start up DFP8 45...
Page 52: ...Checks prior to start up Checking the water level topping up DFP8 52...
Page 53: ...6 Operation Operation DFP8 53...
Page 64: ...Operation Parking the machine in secured condition DFP8 64...
Page 65: ...7 Loading transporting the machine Loading transporting the machine DFP8 65...
Page 69: ...8 Maintenance Maintenance DFP8 69...
Page 100: ...Maintenance As required DFP8 100...
Page 101: ...9 Troubleshooting Troubleshooting DFP8 101...
Page 107: ...10 Disposal Disposal DFP8 107...
Page 109: ......
Page 110: ......