![Fayat Bomag BW 900-50 Service Manual Download Page 138](http://html1.mh-extra.com/html/fayat/bomag-bw-900-50/bomag-bw-900-50_service-manual_546858138.webp)
5.6.4 Bleeding the travel circuit
1.
Secure the drums with chocks.
2.
Actuate the emergency stop switch.
ð
WARNING!
The engine must not start.
3.
Install a pressure test hose to the charge pressure test port.
4.
Install a pressure test hose each to the high pressure test
ports.
5.
Hold the open ends of the pressure test hoses
into a container.
6.
Operate the starter motor for approx. 30 seconds. Wait one
minute and repeat this procedure until oil starts to run out of
the pressure test hoses.
7.
Remove the pressure test hoses.
8.
Unlock the emergency stop switch.
Fig. 147
Fig. 148
Fig. 149
Fig. 150
Hydraulic system – Flushing and bleeding
BW 900-50
141
Go
to
Discount-Equipment.com
to
order
your
parts