
9
b. Secure Relay in an upright position, as shown, to prevent moisture from
entering. Di-electric grease may be applied to prevent corrosion.
a. Disconnect battery before beginning installation. Using ring terminals,
attach red wire of the WH-1002 to the positive battery terminal.
The use
of corrosion preventative spray is recommended.
Attach green wire to
a clean ground, preferably the negative battery terminal. Secure fuse
block in a location protected from outside elements.
Neg.
Pos.
Fuse
c. Connect WE-1006 to the female lead of the WH-1002 coming off the
relay. Route the WH-1002 and WE-1006 along frame rail to the factory
lift pump.
Completion of this step will be addressed in the Mounting
Step .
Factory Lift Pump
WE-1006
The installation of the electrical harness is done first, allowing power to be applied to the pump for
lubrication purposes later in the installation.