![FARONICS POWER SAVE Manual Download Page 35](http://html.mh-extra.com/html/faronics/power-save/power-save_manual_545782035.webp)
Power Plan
|
35
Faronics Power Save User Guide
Power Plan
The Power Plan node allows assigning a plan to one or more workstations.
Power Plans and Power Policies
Power Plans and Power Policies are two main components that are used to define how Power Save
manages power on the computer.
Power Plan
A Power Plan can consist of one or more Power Policies. A Power Plan also includes a schedule to
apply the policy on one or more computers.
Power Policy
A Power Policy consists of:
•
Inactivity Timeout Actions
— defines whether Power Save must turn off monitors, hard disks
and shut down the computer after a predefined interval.
•
Inactivity Definitions
— defines whether Power Save must manage power on the computer
when the hard disk, CPU or network activities are below the specified levels.