����������
4
Setting up a Scheduled Maintenance Period
There are two ways to set up a Scheduled Maintenance Period. The first way is to set it up when
configuring the Deep Freeze Enterprise installation files with the Configuration Administrator (best
method for new deployments). The second way is to create or update the Maintenance Period using the
Enterprise Console. Assuming you have already deployed Deep Freeze throughout your network, the
following instructions elaborate on how to create/update the Maintenance Period with the Enterprise
Console.
1. Open the Enterprise Console, select any workstation, and right-click on it.
2. Select
Update Maintenance Period.
A red bar appears at the bottom of the screen.
3. Click
New
. The
Configuration Screen
appears. It only contains the
Restart/Shutdown
,
Maintenance
, and
Advanced Maintenance
options.
Summary of Contents for DEEP FREEZE ENTERPRISE - PANDA BUSINESSSECURE ANTIVIRUS...
Page 1: ......