CANOPIES
6
Revision date: 05.31.16
Sunblocker Shade House
ASSEMBLE THE MAIN ROOF FRAME
This section is an overview of the process for assembling
your roof frame. See illustration below to identify main parts
of the frame.
1. Locate the required couplers and pipes and assemble
the roof frame as shown below.
2. Secure each pipe in the coupler using the locking
eyebolt. If the couplers are not equipped with locking
eyebolts, secure each pipe in the coupler using a Tek
screw.
3. Secure each rafter pipe joint with a Tek screw and then
tape the screw to protect the cover when it is installed.
ATTENTION
: Position Tek screws so they will not touch
the main covers or side panels (if equipped) when
these are installed.
All locking eyebolts of the couplers must be
installed to the inside of the shelter
.
Pipe Identification
Assembly
Pipe
Quantity
Purlin
166P058
1
Rafter
166P068 & 166S051 1 each
Purlins
Rafters
Rafter
Purlin
NOTE:
Actual
frame may differ
from frame shown.
NOTE:
Diagrams show how
to secure the pipe to the
coupler using Tek screws
if locking eyebolts are not
present.
102193
102193
102194
102193
Main Cover Installation Note:
If the conditions are calm, the main cover can be installed
after the main roof frame is assembled as shown below.
Do not install the main cover during windy or stormy
conditions.
102194