background image

CANOPIES

14

Revision date: 05.31.16

SIDE PROFILE - 2040SPC

166P058

1.66" pipe: 58"

5'-0"  Rafter

Spacing

40'-0" Lengt

h

Summary of Contents for Sunblocker 2020SPC

Page 1: ...Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS 2020SPC 20 W x 20 L 2030SPC 20 W x 30 L 2040SPC 20 W x 40 L 2050SPC 20 W x 50 L 2060SPC 20 W x 60 L Sunblocker Shade House 20 Wide Photo may show a different but similar model ...

Page 2: ... and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchorin...

Page 3: ... assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs p...

Page 4: ...ify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions consult the Pictorial Parts Guide and all shelter diagrams for clarification or contact Customer Service at 1 800 245 9881 NOTE At this time you do not need to open the plastic bags containing smaller parts such as fasteners or washers ALTERNATIVE ASSEMBLY INFORMATION These instr...

Page 5: ...rews are sent with all shelters of this type For couplers with locking eyebolts install the Tek screws at each pipe connection for additional security if desired WARNING To prevent personal injury and damage to the shelter fasten and tighten a Tek screw at each pipe and coupler joint To prevent cover damage install the Tek screw so that it does not touch the main cover or any optional side or end ...

Page 6: ... the cover when it is installed ATTENTION Position Tek screws so they will not touch the main covers or side panels if equipped when these are installed All locking eyebolts of the couplers must be installed to the inside of the shelter Pipe Identification Assembly Pipe Quantity Purlin 166P058 1 Rafter 166P068 166S051 1 each Purlins Rafters Rafter Purlin NOTE Actual frame may differ from frame sho...

Page 7: ...TENTION If used position Tek screws so they will not touch the main cover when installed 3 Inspect the frame for sharp edges or Tek screws that could damage the covers Reinstall the Tek screws if necessary or rotate the pipes and remove or tape any sharp edges 4 After the entire frame is assembled verify that each locking eyebolt is tight 5 Set the frame in the desired location and measure diagona...

Page 8: ... frame See the above insert Use one snugger ball for each grommet 3 Once the main cover is installed unfold the optional side covers additional purchase required along the frame and attach them to the main roof frame using the snugger balls The dashed line in the diagram below shows where to attach the side cover 4 Read the Care and Maintenance section that follows WARNING To prevent property dama...

Page 9: ... that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover that could cause damage Check the anchoring system to ensure that all components are tight and in good repair If the shelter is moved inspect all parts and connectio...

Page 10: ... Revision date 05 31 16 QUICK START GUIDE 20 Wide Sunblocker Shade House 6 5 Height 19 8 5 8 Width Sidewall 12 3 5 8 Height Grid Represents 12 Squares F FR RO ON NT T NOTE Actual frame may differ from frame shown ...

Page 11: ...OFILE 166P060 166S075 End Rafters 102193 Mid Rafters 102194 End Rafters 102193 Mid Rafters 102194 166P077 1 66 pipe 77 1 66 pipe 60 1 66 pipe 75 166P060 166S075 End Rafters 102193 Mid Rafters 102194 166P077 1 66 pipe 77 1 66 pipe 60 1 66 pipe 75 ...

Page 12: ...CANOPIES 12 Revision date 05 31 16 SIDE PROFILE 2020SPC 166P058 1 66 pipe 58 Rafter Spacing 5 0 20 0 Length ...

Page 13: ...13 CANOPIES Revision date 05 31 16 SIDE PROFILE 2030SPC 166P058 1 66 pipe 58 Rafter Spacing 5 0 30 0 Length ...

Page 14: ...CANOPIES 14 Revision date 05 31 16 SIDE PROFILE 2040SPC 166P058 1 66 pipe 58 5 0 Rafter Spacing 40 0 Length ...

Page 15: ...15 CANOPIES Revision date 05 31 16 SIDE PROFILE 2050SPC 166P058 1 66 pipe 58 50 0 Length 5 0 Rafter Spacing ...

Page 16: ...CANOPIES 16 Revision date 05 31 16 SIDE PROFILE 2060SPC 166P058 1 66 pipe 58 60 0 Length 5 0 Rafter Spacing ...

Page 17: ...ision date 05 31 16 CONNECTIONS 102193 Rafter Purlin View 2 Mid Rafter Purlin Connection 102194 Purlin Rafter View 1 End Rafter Purlin Connection End Rafter Purlin Connection View 1 Mid Rafter Purlin Connection View 2 ...

Reviews: