![FarmTek Growers Supply HydroCycle Vertical Aeroponic... Important Information Manual Download Page 6](http://html1.mh-extra.com/html/farmtek/growers-supply-hydrocycle-vertical-aeroponic/growers-supply-hydrocycle-vertical-aeroponic_important-information-manual_3491441006.webp)
6
113593
Revision date: 09.21.18
1. Take the reservoir and locate the smooth surface on the outside at one end.
2. Using a
2-1/4" hole saw bit and drill,
drill the hole for the bulkhead fitting. Clean debris from
around hole and inside reservoir. Ensure hole is an inch or so above the bottom of reservoir to
allow for fitting installation. (Actual tank may differ from the example shown.)
3. Attach WF8582 bulkhead to reservoir. Hex nut and thin flat washer are outside the reservoir. Install
thick rubber washer on inside. Tighten until snug using large adjustable pliers.
4. Continue by preparing the cover for system assembly.
1
DRILL RESERVOIR AND INSTALL BULKHEAD FITTING
Assembly Instructions—Reservoir Preparation
WF8582 Bulkhead
Fitting Installed
Install hex
nut and thin
flat washer
outside
reservoir.
WF8582