18
OI-SH750EH-EN
General Instruction
1. Assembly
SH-750EH is designed to be attached to only EURO quick mounting(or hitch or coupling)
according to ISO 23206:2005(E). The main frame is fully welded and has notched rail for
adjusting manually the distance between the forks. Class 2 hook-on typed Forks designed
according to ISO 2328 are available.
Before fitting pallet fork to front end loader, ensure the machine is on a flat level hard
standing with good enough room to maneuver.
①
Make sure to open the implement locking mechanism of the front loader.
②
Tilt implement-changing-frame(release-frame) approximately 30 degrees to the front.
③
With the front loader attached drive straight onto the machine. Drive with the upper
shaft(A) of the changing frame under the hooks of the machine. Lift and scoop the machine
until it rests on the changing frame.
④
Close the implement locking mechanism appropriately.
(Implements locking mechanism of front loaders can be different according to
Manufacturers. Refer to the manual of front loader you are using.
Summary of Contents for SH-750EH
Page 1: ......