FARMTECH FPD 30 Operator'S Manual Download Page 8

 

 

7

Operation

Once the Hydraulic digger is fitted to the tractor the linkage must be placed in the float position with 
the draft control disengaged  so the digger height is then controlled by the hydraulic cylinder. 

If necessary adjust the sway chains on the tractor linkage to centralize the sub-frame and prevent 
any sideways movement. 

Install the hydraulic cylinder between the lugs on the linkage frame and boom using the pins  
supplied.  Connect the hoses to the tractor, see below for the further details. 

Connecting the Hoses - Hydraulic Model 

Before attaching or removing the hydraulic hoses ensure that the quick release connections are 
clean to avoid contaminating the system. 

Plug the digger hoses into the tractor remote outlets.  For safety reasons it is desirable to always fit 
the hoses in the same pattern to ensure that the direction of the control to apply downward pressure 
will always be the same.  This can be achieved by marking the hoses with tags.  Ensure the hoses 
are well supported and clear of the tractor wheels. 

Attaching the Gearbox and Auger - All Models 

Lower the digger boom fully.  Position the gearbox an auger assembly behind the boom and align the 
pivot pin holes.  Install the pivot pin and secure with the split pin provided.  Make sure that the input 
shaft of the gearbox is facing towards the tractor, so that the PTO shaft can be fitted. 

Raise the boom to full height to allow the auger to hang vertically then lower it so the end of the  
auger rests on the ground. 

Connecting the PTO Shaft - All Models 

Clean and grease the splines on the tractor and digger PTO stub shafts and install the PTO shaft 
making sure that the spring loaded locking pins engage in the grooves of both stub shafts. 

Ensure that the PTO stub shaft guard is fitted to the tractor. 

Check that the PTO shaft is of the correct length, as follows.  On Standard digger models set the  
linkage so the ends of the two stub shafts are closest.  Install the PTO shaft then depress the locking 
pin at the gearbox end and pull the shaft back to check there is at least 25mm of telescopic travel 
remaining.  Refit the PTO shaft and raise and lower the digger to check that the telescopic tubes 
overlap by approximately1/3rd their length, and not less than 150mm, in all positions.  On the  
Hydraulic model check these dimensions in the fixed operating position.  Refer diagram below. 

If the PTO shaft has to be shortened cut equal amounts from both male and female shafts and safety 
covers.  Carefully remove all burrs then clean and relubricate before reassembling.  

Relieve all hydraulic pressure before connecting or disconnecting hoses.  Oil 
escaping under pressure can penetrate skin, causing serious injury.  Seek 
immediate medical treatment if injured by escaping oil. 

Summary of Contents for FPD 30

Page 1: ...WA R N I N G R e a d p o w e r d o w n o p e r a t i o n b e f o r e u s e...

Page 2: ...ic model 6 Connecting hydraulic hoses 7 Attaching Gearbox Auger all models 7 Connecting PTO shaft all models 7 Detaching digger from Tractor 8 Attaching assembled digger to the Tractor 8 Changing the...

Page 3: ...owned and family operated company We first started manufacturing in 1976 Our company has an excellent production plant in Wodonga set up to specialize in the design and manufacture of post hole digge...

Page 4: ...as FTM welcomes any warranty repair and apologises for any inconvenience See the last page for the express warranty coverage offered The following information will assist your understanding of warran...

Page 5: ...start digging until the circum stances have been fully investigated and it is safe to begin x Exercise extreme care when operating in wet or slippery conditions or on sloping or uneven terrain Allow f...

Page 6: ...of the safety decals fitted to all FTM post hole diggers is shown below It is important that all operators read and follow the information given on the decals They should be kept clean and legible at...

Page 7: ...ulic cylinder with hoses connected and gearbox with auger attached are supplied as separate items The following instructions apply for the first installation The Hydraulic digger is fitted with bolt o...

Page 8: ...nput shaft of the gearbox is facing towards the tractor so that the PTO shaft can be fitted Raise the boom to full height to allow the auger to hang vertically then lower it so the end of the auger re...

Page 9: ...above the ground Stop the tractor engine and apply the parking brake Remove the two attaching bolts from the upper end of the auger and pull down so that it slides off the gearbox shaft If the auger...

Page 10: ...ecessary to adjust the clutch remove the PTO shaft and turn each of the nuts on the clutch spring bolts by one half turn Turning the nuts clockwise increases spring loading and reduces clutch slip Tur...

Page 11: ...off the auger flighting then continue drilling When raising or lowering the auger move the tractor forward or backward to keep the auger vertical and compensate for the arc of the boom If the safety...

Page 12: ...out oil in the gearbox and it is the dealer s responsibility to add it before delivering the machine However before starting the digger for the first time the oil level should be checked and if necess...

Page 13: ......

Page 14: ...F G G H H I I J J K K L L 2 1 10 1 14 5 2 9 6 7 8 3 8 7 SPARE PARTS 75 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4...

Page 15: ...HEX NUT 400022 75 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 75 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 75 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 75 HP STD POWERDOWN 4 11 6 FLAT...

Page 16: ...G G H H I I J J K K L L 2 1 11 1 5 6 2 10 7 8 9 3 9 8 SPARE PARTS 50 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4 2...

Page 17: ...50 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 50 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 50 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 50 HP STD POWERDOWN 4 11 6 FLAT WASHER M12 400...

Page 18: ...E E F F G G H H I I J J K K L L SPARE PARTS FOR POST HOLE DIGGER 30 HP SEE SHEET 2 FOR BILL OF MATERIALS 6 1 3 8 8 2 10 7 9 COMES IN A PACK OF 4 x BOLT NUT WASHER SEE BREAK DOWN OF ITEM 4 ON RIGHT 4...

Page 19: ...PRESSURE PLATE B4168 400533 4 5 6 BLUE HD SPRING B3729 400531 4 6 2 M10 HEX NUT 400011 4 7 6 M12 HEX NUT 400022 4 8 2 M10 FLAT WASHER 400038 4 9 2 HEX BOLT M10x70 MM 400040 4 10 6 BOLT M12x90 MM UNF 4...

Page 20: ...3 1 B8024 24 AUGER 400546 POST HOLE DIGGER ALL 3 1 PAIR OF AUGER TEETH B7512 400525 B8004 B8011 4 2 PAIR OF AUGER TEETH B7512 400525 B8007 B8009 B8014 B8012 4 3 PAIR OF AUGER TEETH B7512 400525 B8015...

Page 21: ...P O BOX 638 WODONGA VIC 3689...

Reviews: