FARMER FRIEND QUONSET Assembly And Instruction Manual Download Page 6

A

B

C

Well-designed, quality tools and equipment

  |

farmers

friend

llc

.com 

 QUONSET 

 QUONSET PRO 

 GOTHIC 

 GOTHIC PRO 

 UPGRADE

B O W   A S S E M B LY

Attaching cross bracing to bows is easiest when done during 

bow assembly on a level surface.

1. 

Pry brace bands open enough to slide over bows. Use 
two pairs of pliers for leverage.

2. 

Slide two brace bands onto each Gothic bow and position 

39" from peak of bow in both directions. 

See Figure 6

3. 

Squeeze flanges back together with pliers, leaving some 
slack.

4. 

Attach cross brace to brace bands with bolt. Finger 

tighten nut. 

5. 

Center cross brace in the peak, then tighten nuts. 

6. 

Repeat process for correct number of bows. 

See Table 3

tools needed

• 

2 Pairs of Pliers

• 

1/2" Socket or Wrench

materials included

Nuts and Bolts

Brace Bands 

Cross Braces

Watch the video! 

Scan the code or viSit: 

fflc.us/cross-bracing/v

Step 1

Step 4

Step 3

Step 5

39"

39"

100-Ft tunnel with 4-Ft bow Spacing

100-Ft tunnel with 5-Ft bow Spacing

50-Ft tunnel with 4-Ft bow Spacing

50-Ft tunnel with 5-Ft bow Spacing

table 3

Number of Bows 

with Cross Braces 

Bow  

Spacing

50-ft

Tunnel

100-ft

Tunnel

4-foot

6 bows

12 bows

5-foot

5 bows

10 bows

Figure 6: brace band placement

Grey lines represent bows. Colored circles indicate bows with cross braces.

8

9

Summary of Contents for QUONSET

Page 1: ...Caterpillar Tunnel a s s e m b ly a n d i n s t r u c t i o n m a n u a l Watch the video Scan the code or visit fflc us tunnel s...

Page 2: ...world a healthier happier place and we are developing the tools to make your work more productive and enjoyable Your success is our success From the whole team here at Farmers Friend I want to wish y...

Page 3: ...manent Marker Saw Drill Tape Measure Sledge Hammer String Post Hole Digger Level 1 2 Wrench Ground Post Driver Materials Needed 6 2 4 8 Boards 11 2 Wood Screws Concrete Materials Included A Self Tappi...

Page 4: ...should not exceed 2 feet Plastic will not go to ground if post exceeds these specifications table 3 table 4 Post Above Soil Post Below Soil Hole Depth 12 36 40 14 34 38 16 32 36 18 30 34 Post Above So...

Page 5: ...interchangeability See Figure 5 Tools Needed Drill or Impact Driver 5 16 Driver Bit Materials Included A Side Curtain Hooks B Self Tapping Screws C Quonset Bow Section D Gothic Bow Section B O W A S S...

Page 6: ...bands with bolt Finger tighten nut 5 Center cross brace in the peak then tighten nuts 6 Repeat process for correct number of bows See Table 3 Tools Needed 2 Pairs of Pliers 1 2 Socket or Wrench Mater...

Page 7: ...ity tools and equipment farmersfriendllc com QUONSET QUONSET PRO GOTHIC GOTHIC PRO UPGRADE 1 Insert a Lift Kit post into bottom of each bow 2 Connect posts with one self tapping screw on the side of e...

Page 8: ...3 Insert purlin strap into clasp at one end then wrap strap ping around each bow Using a step ladder wrap purlin strap around the top center of each bow Ensure bows are standing up straight and strap...

Page 9: ...three self tapping screws to attach the purlin tube to the first bow Tools Needed Ladder Drill or Impact Driver 5 16 Driver Bit 7 16 Socket or Wrench Level Optional Materials Included A Tube Strap B...

Page 10: ...id snagging plastic Tools Needed 2 Pairs of Pliers Ladder Drill or Impact Driver 5 16 Driver Bit 1 2 Socket or Wrench 3 8 Socket or Wrench Materials Included A Stainless Steel Cable B Cable Clamps C B...

Page 11: ...nd with supplied bolt Finger tighten nut Make sure bolts face to the inside of the tunnel to avoid puncturing the plastic 4 Slide a brace band onto Bow 2 5 Attach other end of wind brace to brace band...

Page 12: ...l is used We recommend using at least one channel per end Side ventilation will be incrementally restricted when using two or more channels Wiggle wire can be removed to increase ventilation however r...

Page 13: ...r end of tunnel Clip into carabiner on spot 3 Pull out enough rope between spot 1 and 3 to throw over tunnel Clip into spot 2 Repeat to the end See Figure 8 5 Tighten Rope Have one person at spot 2 an...

Page 14: ...and run through clips to corner 2 carabiner Starting at corner 1 pull rope down to carabin ers between clips Pull rope tight and tie off corner 2 Repeat on other side Method 2 Attach clips to cloth a...

Page 15: ...762 Dry Prong Rd Williamsport TN 38487 support farmersfriendllc com 931 583 0397...

Reviews: