
Operation - Round Bale Carrier 2400
36
Break - In Checklist
Check the following mechanical items after 1 hour of
operation and again after 10 hours of operation:
1.
Check condition of all hydraulic components for leaks.
Tighten fittings to correct leaks or replace
components. Do not operate with hydraulic leaks.
Figure 26
2.
Check the bale carrier hitch for damaged, loose or
missing parts
. Repair as needed before
operation.
3.
Check for loose fasteners and hardware. Tighten as
required.
4.
Check that tire pressure is 90 psi (620 kpa).
5.
Check that wheel bolt torque is 90 ft. lb. (122 Nm).
B-10050
Summary of Contents for 2400
Page 2: ......
Page 4: ...Table of Contents Round Bale Carrier 2400 4 ...
Page 6: ...Warranty Registration Round Bale Carrier 2400 6 ...
Page 8: ...Introduction Round Bale Carrier 2400 8 ...
Page 12: ...Safety Round Bale Carrier 2400 12 ...
Page 22: ...22 Assembly Round Bale Carrier 2400 ...
Page 34: ...34 Operation Round Bale Carrier 2400 ...
Page 48: ...Operation Round Bale Carrier 2400 48 ...
Page 50: ...Maintenance Round Bale Carrier 2400 50 ...
Page 62: ...Parts Identification Round Bale Carrier 2400 62 ...
Page 81: ...Parts Round Bale Carrier 2400 81 Electrical Schematic 2018 and later ...
Page 94: ...Parts Round Bale Carrier 2400 94 ...
Page 96: ...Specifications Round Bale Carrier 2400 96 ...
Page 100: ...Specifications Round Bale Carrier 2400 100 Electrical Schematic 2018 and later ...
Page 104: ...Specifications Round Bale Carrier 2400 104 ...
Page 105: ...Warranty Round Bale Carrier 2400 105 WARRANTY WARRANTY 107 ...
Page 106: ...Warranty Round Bale Carrier 2400 106 ...
Page 110: ...Alphabetical Index Round Bale Carrier 2400 110 ...
Page 111: ......