Align a top side rail (P7) to each of the dowels at the top of side posts (P3 &P4).
As you align each top side rail, you may need to gently bow the frame slightly at the top to attach
the rails to the dowels.
To ensure each rail stays in place while you do this, insert 4 x barrel nuts (H5) into the top
side rails (P7). Ensure the openings of the barrel nuts face the incoming bolts. Then loosely secure
the top side rails in place with 2 x long bolts (H4), 2 x flat washers (H10) and 2 x spring washers
(H14) with the allen key (H9) before moving to attach to the other top side rail (P7).
fantasticfurniture.com.au
Page 12
You will need
4 x Long Bolts
(H4)
4 x Barrel Nuts
(H5)
1 x Allen Key
(H9)
4 x Flat Washers
(H10)
4 x Spring
Washers
(H14)
(P4)
(P3)
(P7)
(P5)
(P3)
(P4)
(P5)
(P6)
(P6)
(P7)
(H5)
(H10)
(H14)
(H4)
(H9)
Step 8