F&F LE-03 Quick Start Manual Download Page 2

Installation

Connection diagram

SO

+

9

8

D141020

* Please read the manual carefully prior to installing the meter.
* The meter should be installed and operated by qualified per-

sonnel  familiar  with  the  construction,  operation  and  any 
hazards involved.

* Do not install the meter if it is damaged or incomplete.
* The user is responsible for proper grounding, selection, instal-

lation and functionality of any other devices connected to the 
meter, including security devices such as overcurrent protec-
tion breakers, differential switches and surge protectors.

* Before connecting the power supply make sure that all cables 

are connected properly. 

* Always follow the operational conditions of the meter (voltage, 

humidity, temperature). 

* In order to avoid electric shock or damage to the meter, discon-

nect  the  power  before  each  change  in  connection  configu-
ration.

* Do not modify the device on your own, as this may cause dama-

ge  or  improper  operation  of  the  meter  and  consequently 
expose the users to risk. In these cases the manufacturer is not 
liable for ensuing events and reserves the right to refuse the 
warranty claims on the counter.

General safety conditions 

Technical data

reference voltage

3×230/400V+N

base current

10A

maximum current

100A

minimum current

0.04A

st

accuracy class

1  class

compliance

IEC61036                

own power consumption

<10VA; <2W

indication range

0÷999999.9kWh

meter constant

(1.25 Wh/pulse) 800pulses/kWh

current consumption signalling L1, L2, L3 phases

3× red LED

kWh read-out signalling

red LED

SO+ SO- pulse output

open collector

SO+ SO- connection voltage

<12÷27V DC

SO+ SO- connection current

<27mA

SO+ SO- constant

(1.25 Wh/pulse) 800pulses/kWh

SO+ SO- pulse duration

 (load-dependent)

34÷80msec

SO+ SO- wire length 

<20m

working temperature

-20÷55°C

terminal

25mm² screw terminals

housing

ABS material

dimensions

7 modules (122×100×65mm)

mounting

on TH-35 rail

ingress protection

IP20

1. Disconnect the switching station power.
2. Mount the meter on the TH rail in the distribution box.
3. Open the covers on the terminals.
4. Connect the power to terminal 1 (L1 IN), terminal 3 (L2 IN), 

terminal 5 (L3 IN).

5. Connect a measured circuit or a single receiver to terminal 2 

(L1 OUT), terminal 4 (L2 OUT), terminal 6 (L3 OUT).

6. Connect wire N to terminal 7.
7. Optionally connect the RS-485 network wires to the 9(A+) - 

8(B-) terminals.

8. Close the covers on the terminals and optionally seal them.

1

2

- 5-

- 6-

- 7-

- 8-

Reviews: