- 5 -
1
L1
IN
phase wire
7 N-wire neutral
2
L1
OUT
phase wire
20 pulse output (+)
3
L2
IN
phase wire
21 pulse output (–)
4
L2
OUT
phase wire
5
L3
IN
phase wire
6
L3
OUT
phase wire
1.
Disconnect the power supply.
2.
The indicator mounted on a rail in the distribution box.
3.
Using a screwdriver, remove the screws and remove the front
shield meter terminals.
4.
Connect the voltage-controlled phase, following the indica-
tions to terminals 1 (L1), 3 (L2), 5 (L3).
5. N-wire connect to terminal 7.
Do not tighten the terminals without an inserted wire.
This may damage the clamping mechanism or the plastic
cover of the terminal.
6. Additional pulse receiver connected to terminals 20(+) – 21(–).
The terminals are located under the top shell meter terminals.
Additional pulse receiver is not required.
7.
Put the meter terminals covers.
Mounting