2.
Installing the FB
Install the FB and associated components as follows:
1. Mount the FB.
2. Connect the FB.
3. Test the FB.
2.1
Mounting the FB
Never place the FB in a place where the weather has direct influence (not in the sun, not in places
where the temperature can rise sharply etc.).
Place FB in a location such that the manual operation is easily reached (preferably outside a
department, due to corrosion from stall air).
Fancom recommends mounting the FB as follows:
1. Drill holes in the floor. You can use the drill template delivered with this.
2. Place the FB, glands on the bottom, on a flat floor surface.
3. Grout the glands with sealer to prevent penetration by moisture and dust and/or corrosive gasses.
2.2
Connecting the FB
Connect the FB as follows:
1. Set the power supply (see (p. 3)).
2. Set the signalling memory (see (p. 3)).
3. Set the audio or visual signal interval (see (p. 4)).
4. Set the delay time (see (p. 4)).
5. Set signalling contact inputs (see (p. 4)).
6. Set external OFF indicator (see (p. 5)).
7. Set phase control voltage (see (p. 5)).
8. Set battery voltage (see (p. 5)).
2.2.1
Setting the power supply
Determine the power supply setting with the J1 jumper setting:
Power supply voltage
J1
Single-phase power supply
Yes
Three-phase power supply
No
2.2.2
Setting the signalling memory
Determine the signalling memory with the J2, J3 and J10 jumper settings:
Signalling memory
J2
J3
J10 (a,b)
No signalling
No
No
Yes
Battery and phase signalling memory
Yes
No
Yes
Battery, phase and signalling input memory:
Yes
Yes
No
3