Fanani IGLOO TECHST-GL Assembly Instructions Manual Download Page 8

7

6

4,5

4,5

=

=

18

IGLOO TECH ST-GL

IGLOO TECH ST-GL

17

5

Belowsupportsheight

(orbelowwallbeam)

IMPORTANT:
Before proceeding with the wall mounting supports fixing, establish their position

Maximalbackheight

1 Clearance check and brackets positioning

Front joint detail

Maximalbackheight

Passage

height

FANANI / SEMI-FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS

Direct fixing with purlins supports 2A

Finished width

1) mark the supports position to the wall as
indicated in the illustration below (support gap is
indicated in the technical sheet) and drill the wall
to place the plugs
2) fix the supports with adequate screws (provided
by the installer)

IMPORTANT: supports position must center the

bubble in spirit level

i

FANANI / SEMI-FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS

Summary of Contents for IGLOO TECHST-GL

Page 1: ...Rev 1 03 17 IGLOOTECHST GL SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS...

Page 2: ......

Page 3: ...terial Before starting Clearance check Wall fixing Floor squaring Load bearing gutter Uprights bases and load bearing gutter p 13 Lower purlins support Side beams p 15 Purlins p 16 Load bearing gutter...

Page 4: ...IGLOO TECH ST GL 2 Versions 1 module 2 modules 3 modules FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS...

Page 5: ...ht with side base upright with central base upright with hidden base side beam purlin fron load beam load bearing gutter wall beam purlin ceiling support wall beam support dividing upright 11x5 glass...

Page 6: ...L CONTENTS LABEL roller blind set box bottom rail fabric etc side guides side beams and uprights frontal gutter others EQUIPMENT BOX wall supports beam uprights links wind break supports when present...

Page 7: ...tructions attached The mounting as the working operations have to be execute by skilled personel only in scrupulous mode respectin the current security laws TRANSPORT HANDLING STORAGE The roller blind...

Page 8: ...m IMPORTANT Before proceeding with the wall mounting supports fixing establish their position Maximal back height 1 Clearance check and brackets positioning Front joint detail Maximal back height Pass...

Page 9: ...ll as indicated in the illustration below support gap is indicated in the technical sheet and drill the wall to place the plugs 2 fix the supports with adequate screws provided by the installer IMPORT...

Page 10: ...supports Finished width 1 position the beam as per illustration below 2 fix the beam with with adequate screws provided by the installer IMPORTANT the beam position must center the bubble in spirit l...

Page 11: ...upports dividing the gap between them as much equally as possible 2 place the beam on the supports and fix it with the provided screws threaded holdind plates pre inserted in the beam IMPORTANT suppor...

Page 12: ...ANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 2D Purlins supports on wall beam 1 fix the purlins supports with the provided screws threaded holding plates pre inserted in the beam as per illu...

Page 13: ...ANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS Squaring 3 i IMPORTANT DO NOT FIX THE BASES IN THIS PHASE 1 place the upright base to the ground in the correct position verify the measures and ma...

Page 14: ...TECH ST GL FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 1 insert the internal tighteners and fix them 4 Load bearing gutter accessories Keep a gap of 15 20 cm between the external gutter ed...

Page 15: ...UCTIONS 1 fix the uprights to the bases with the provided screws TSP M8x12 2 fix the tech internal bracket into the upright with the provided screws 3 fix the load bearing gutter to the uprights with...

Page 16: ...IGLOO TECH ST GL FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 6 Lower purlins support 1 insert the holding plate into the slotted profile 2 fix the purlins supports on the load bearing gutt...

Page 17: ...EMBLY INSTRUCTIONS Side beams 7 1 fix on the wall the side beam support 2 insert the side beam into the wall support rise the uprights with the load bearing gutter inserted and fix it on the side beam...

Page 18: ...TECH ST GL FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 8 Purlins 1 place the purlins and fix them with the provided screws ATTENTION in presence of led stripes insert them before placing t...

Page 19: ...O TECH ST GL Frontal gasket 9 insert the black gasket and block it with the provided dowels Shape it after the guide and the side gutters positioning see chapter 17 ATTENTION gasket correct position f...

Page 20: ...er caps iIMPORTANT Apply silicone on the entrance piece edge before inserting it into its location i IMPORTANT Fix the gutter side caps and apply silicone on the bottom and on the side edges FANANI SE...

Page 21: ...ONS Glass holder profile 11 1 fix the glass holder profiles on all the purlins with the self drilling screws provided 2 insert the side filler part into the external glass holder profile part Insert t...

Page 22: ...oles with the provided caps 5 place the frontal caps and tighten its screws 3 place the glass holder cover starting from A proceed with B and finish with C then fix it to the glass holder profile with...

Page 23: ...Place the wall gasket and make sure to fix it about every cm 100 therefore apply silicone on the top edge i IMPORTANT IN CASE OF MORE MODULES IGLOO VERSIONS DO NOT CUT THE RUBBER GASKET FANANI SEMI FA...

Page 24: ...Fanani srl www fananitende it Via Caduti di Sabbiuno 7 40011 Anzola dell Emilia Bologna Italy T 39 051 401320 F 39 051 403022 skype fananitende info fananitende it...

Reviews: