16
FUMES DISCHARGE
(only intended for personnel qualiied to assemble the hood)
EXTERNAL EXHAUST HOOD VERSION (SUCTION)
In this version, the kitchen fumes and vapours are conveyed outside through an exhaust pipe.
The air outlet itting that extends from the upper part of the hood must be connected with the pipe that conducts
the fumes and vapours to an external output.
Do not connect the equipment to discharge pipes of fumes produced from combustion (for example boil-
ers, ireplaces, etc) and you are to comply with the regulations in force regarding external air discharge.
The fumes outlet pipe must have:
- a diameter not less than that of the hood itting;
- a slight slope downwards (drop) in the horizontal sections to prevent any formation of condensation from lowing
back to the hood;
- the minimum required number of bends;
- minimum required length (long pipes with various bends can reduce suction performance of the hood and trigger
vibrations of the check valve).
If the fumes outlet pipe passes through cold environments such as attics, etc., it is possible that water condensation
forms due to sudden changes in temperature. In this case, you are required to insulate the pipes.
The hood supplied with an 800 m
3
/h motor is equipped with a check valve whose function is to prevent external air exchange when the hood is not
operating: refer to the instructions
for assembly.
When the kitchen hood is used simultaneously with other appliances that use gas or other fuels, the room must have suicient ventila-
tion, in accordance with regulations in force.
The active carbon ilters in this version are to be removed. Refer to the instructions
on page
for removal.
Deviation for Germany: when the kitchen hood is used at the same time as appliances that are powered by energy other than electricity, the negative pressure
in the room must not exceed 4 Pa (4 x 10-5 bar).
HOOD VERSION WITH INTERNAL RECIRCULATION (FILTERING)
In this model, air passes through the active carbon ilters to be puriied and is then recycled into the kitchen envi-
ronment.
Check that the active carbon ilters are assembled onto the hood, if not, install them as indicated in the in-
structions
.
If the hood is set up with a iltering version, the check valve must not be assembled: remove it if it is on the air outlet
itting of the motor (carry out operations described in the instructions
on page
in reverse order).
ASSEMBLY INSTRUCTIONS
(only intended for personnel qualiied to assemble the hood)
Phase
•
Place the support bar (
S
) on the installation wall at a height (
H
) from the cooker indicated in the igure (Fig.
1
).
•
Use a spirit level to check the horizontal alignment and draw 2 marks at each end of the support bar, this is where the holes will be drilled (Fig.
2
-
3
).
•
Drill the holes, insert 2 expansion plugs (ø 8mm) and fasten the bar with the relative screws (
V1
) (Fig.
4
).
The ixing kit (screws, plugs, and brackets) supplied with the hood can only be used on masonry walls:
should it be necessary to
install the hood onto walls in a diferent material, assess other ixing systems keeping the wall resistance and weight of the hood in mind
(indicated on page
).
Phase
•
Hook the hood onto the support bar (Fig.
1
).
•
Adjust the alignment of the hood by using the ixing screws (Fig.
2
). The upper screw (
B
) adjusts the distance from the wall, the lower one (
C
)
adjusts vertical scrolling.
•
To prevent the hood from falling due to a pressure below, fasten it to the wall with expansion plugs and relative screws (
V2
) using the appropriate
holes on the back of the hood (Fig.
3
).
Phase
EXTERNAL EXHAUST HOOD VERSION (SUCTION)
•
Only for versions with an 800 m
3
/h
motor: if you wish, install the check valve (
M
) as indicated in igure
•
Connect the air outlet connection of the hood to the external discharge with a suitable pipe.
HOOD VERSION WITH INTERNAL RECIRCULATION (FILTERING)
•
Check that the active carbon ilters are assembled onto the hood, if not, install them as indicated in the instructions
•
If installed, remove the check valve assembled on the hood air outlet itting (carry out the instructions described
in reverse order).
Phase
•
Insert the extension (
H
) in the chimney (
G
) (Fig.
1
) and fasten the assembly to the body of the hood using screws (
V3
)(Fig.
2
).
Summary of Contents for PLANE
Page 5: ...5 5 L H V5 x2 3 L L H 4 6 mm 6 6 V4 x2 1 2 E F G H V3 x6 1 2...
Page 6: ...6 1 2 3 4 5 MAGNETE MAGNET G 1 2 3 1 2 2 12V 1 2 3 H I L...
Page 34: ...34 2 10 Il l 8...
Page 35: ...35 1 5 34 A 4 65 25 6 EN60335 2 31 11 07 2002 TC61 7 12 1 15 10 11 70 C III...
Page 37: ...37 F 5 H 1 2 L L 3 2 6 L V4 4 V5 H L 5 15 30 3 4 38 15 30 3 H 6 1 2 3 4 4 7 3 1 2 3 L 6...
Page 38: ...38 15 Fasteel G 6 1 55 C G 6 H 6 3 4 G 6 H 6 I 6 E C WEEE...
Page 75: ......