![Falcon UNINTERRUPTIBLE POWER SUPPLY MODELS SG2K-1T Battery Replacement Manual Download Page 6](http://html1.mh-extra.com/html/falcon/uninterruptible-power-supply-models-sg2k-1t/uninterruptible-power-supply-models-sg2k-1t_battery-replacement-manual_3471200006.webp)
18.
Verify the UPS chassis orientation has not moved since reinstalling the batteries.
19.
Reconnect the Red (+15) wire to the + (red) terminal on BATT 1 as shown.
20.
Reconnect one end of the 1st Black jumper wire to the - (black) terminal of BATT 1
and reconnect the second end of the 1st jumper to the + (red) terminal of BATT 2
as shown.
21.
Reconnect one end of the 2nd Black jumper wire to the - (black) terminal of BATT 2
and reconnect the second end of the 2nd jumper to the + (red) terminal of BATT 3
as shown above.
22.
Reconnect one end of the 3rd Black jumper wire to the - (black) terminal of BATT 3
and reconnect the second end of the 3rd jumper to the + (red) terminal of BATT 4
as shown above. CAUTION: Move this jumper wire to under the sheet metal lip to
prevent the top cover from shorting the jumper when reinstalled.
23.
Reconnect one end of the 4th Black jumper wire to the - (black) terminal of BATT 4
and reconnect the second end of the 4th jumper to the + (red) terminal of BATT 5
as shown above.
24.
Reconnect one end of the 5th Black jumper wire to the - (black) terminal of BATT 5
and reconnect the second end of the 5th jumper to the + (red) terminal of BATT 6
as shown above.
25.
Using a DC Volt Meter touch the red lead of the meter on the + (red) BATT1
terminal and touch the black meter lead to the - (black) BATT 6 terminal. The meter
should read +72-81Vdc if the batteries are connected correctly. If the voltage
reading is 0Vdc, less than 65Vdc. check all battery wiring connections This voltage
must read +72-81Vdc before performing the next step.
Battery Connection Diagram
5
BATT 1
BATT 2
BATT 3
BATT 4
BATT 5
BATT 6
Move this jumper wire to under the
sheet metal lip to prevent the top
cover from shorting the jumper
when reinstalled.