background image

7.

Remove the two screws securing the battery hold-down bracket. Next, unplug the 
sensor board connector.

8.

Remove the third screw securing the battery hold-down bracket (see detail picture)

9.

Gently lift the battery hold down bracket and rotate it off of the batteries. Use care 
not to pull the remaining wiring connected to the battery hold down bracket.

10.

Immediately disconnect the red battery wire marked 15+ connected to the + (red) 
terminal of BATT 3.

11.

Lift the batteries to an upright position and disconnect the black wire marked 
15- and disconnect the two black battery jumper wires.  

Battery hold down

bracket

2 screws securing hold

down bracket

Third screw securing

the battery hold down

bracket

Unplug top sensor

board connector

4

Exposed Batteries

Removed Battery Hold

Down Bracket

BATT 1

BATT 2

BATT 3

Summary of Contents for SG800-1, SG800-2 SG1K-1T, SG1K-2T SG2K-1T

Page 1: ...demarks are the property of their respective owners The information stated in this document is subject to change without notice 2004 02 02 Falcon Falcon Electric and UPS Plus logos are registered trad...

Page 2: ...ains sealed maintenance free batteries VRLA When situated in a typical office environment with the proper charging and limited cycling the batteries can last many years In home office or computer room...

Page 3: ...RE HANDLING AND RECYCLING OF SEALED LEAD ACID BATTERIES LIMITATION OF LIABILITY FALCON ELECTRIC INC ASSUMES NO LIABILITY FOR INCIDENTAL OR CONSEQUENTIAL LOSS OR DAMAGE DUE TO THE THIRD PARTY SERVICING...

Page 4: ...UPS is facing you UPS on its side 4 Remove the four screws securing the UPS top cover to the bottom of the UPS chassis 5 Carefully return the UPS and top cover to the upright position 6 Carefully slid...

Page 5: ...ring connected to the battery hold down bracket 10 Immediately disconnect the red battery wire marked 15 connected to the red terminal of BATT 3 11 Lift the batteries to an upright position and discon...

Page 6: ...terminal of BATT 3 and reconnect the second end of the 1st jumper to the red terminal of BATT 2 as shown 16 Reconnect one end of the 2nd Black jumper wire to the black terminal of BATT 2 and reconnec...

Page 7: ...battery connection diagram on the previous page The bottom of BATT 2 should be flat against the bottom of BATT 1 24 Dress the battery wiring between and around the batteries so that the wires will not...

Page 8: ...removed in step 4 and tighten 35 If the UPS is model SG1K 1T reinstall the battery fuse and cap 36 Connect the UPS to an utility power source 37 Turn on the UPS power switch located on the rear panel...

Reviews: