6
3.
Installation
1.
The cooker hood should be placed at a distance of 65-75cm (26-30inch) from
the cooking surface for the best effect. See Pic 1.
Pic 1
2. The ceiling must can bear at least 120KGs weight, and the thickness of the ceiling
must be
≥
30MM; And drill 1*170MM round hole in the ceiling,
3.According to the hanging board, drill 12 holes in the ceiling (see pic. 2).12pcs of
ST6*40mm big flat screws will be used to fix the hanging board on the ceiling. Then
8pcs of M4*10 screws and M4 nut with gasket will be used to connect the angle iron
into the hanging board. Calculate the length of the angle iron, and connect the angle
iron with another angle iron with 16pcs M4*10 big flat screws and M4 nut( the
overlap length of angle iron cannot less 100MM).
Pic2 Pic3 Pic4