Commissioning
The measurement analysis system is supplied with factory settings (default) and
must be adapted to the local conditions.
Detailed information about configuration of the measurement analysis
system can be found in Chapter 6 "Operation".
The values for the factory settings are listed in Chapter 9 "Menu
structure with factory settings".
Proceed as follows for commissioning the system:
1. Install the UM-X measurement analysis system in its designated place and
install the filling level sensor in the tank.
2. Connect at least the auxiliary power and the sensor.
3. Pay attention during assembly that the ribbon cables from the display and
from the membrane keypad are plugged in correctly before closing the
measurement analysis system.
4. Now switch on the auxiliary power.
5. Adjust the 4 mA point (bottom) and the 20 mA point (top, tank height) on the
filling level sensor.
6. Now go to the measurement analysis menu. Select the item "Height" and set
the tank height.
7. If the 4 mA point is not at the height of the tank bottom, set the correct height
in the "Offset" menu.