Electrical connection
Page 12/37
5.4
Wiring …
5.4.1
… with cable gland
Wiring work may only be performed with the power disconnected.
For the wiring of the level sensor, proceed as follows:
(1)
Unscrew probe head cap (1) using an open-ended spanner.
(2)
Loosen union nut (2) of screwed cable gland (3).
Figure 9: Wiring
Figure 10: Removable screw terminal
(3)
Feed the two-core cable (4) into the union nut (2) and tighten the nut.
The external diameter must be 5 to 10 mm.
(4)
Remove screw terminal (5).
(5)
Connect the two-core cable (4) to the (+) and (–) marked pols of the screw terminal
(5).
(6)
Plug the screw terminal (5) back on. The cable must have no traction.
(7)
Configure reference points if necessary (see chapter 6.1).
(8)
Screw probe head cap (1) back on.
The earth connector on the underside of the probe head can be used for earthing or equi-
potential bonding.
1
3
2
4
Cal/Err
+
4 mA
20 mA
–
3
2
4
5
5
Summary of Contents for HART TORRIX
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 41: ...Blank Page ...
Page 42: ...Blank Page ...
Page 43: ...Blank Page ...