Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS
COMPLETE UNIT.
Scroll Picnic Set
Scroll Picnic Set
1. Dig holes for foundation pads (see illustration) and position table and benches in holes in correct orientation with bases
central in each hole. For correct heights table and bench legs should sit 300mm below finished ground level (table
750mm & bench 450mm above FGL)
2. Carefully pour concrete for each pad. Check table and benches are level and maintain at correct height and vertical until
concrete sets (at least 24 hours).
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on
stainless steel components.
4
SCROLL PICNIC SET installation