Ground

level

Foundation pad

400x400x400mm

in C20 concrete

(recommendation only)

7

5

0

760

2000

1200 Ctrs

3

0

0

660 Ctrs

4

5

0

295

130

295

130

660 Ctrs

800

400

400

260

400

400

400

260

1615

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS 

COMPLETE UNIT.

Scroll Picnic Set

Scroll Picnic Set

1. Dig holes for foundation pads (see illustration) and position table and benches in holes in correct orientation with bases 
    central in each hole.  For correct heights table and bench legs should sit 300mm below finished ground level (table
    750mm & bench 450mm above FGL)

2. Carefully pour concrete for each pad.  Check table and benches are level and maintain at correct height and vertical until 
    concrete sets (at least 24 hours).

IMPORTANT NOTE:

Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on 
stainless steel components.