!
"
#
$
%
&
'
(
)
*
+
%
'
,
'
%
-
.
)
(
/
0
1
1
2
,
1
1
2
3
1
1
4
4
+
'
5
,
1
6
%
'
6
7
8
*
8
9
7
8
6
%
4
4
8
'
(
)
*
+
%
'
%
'
:
;
<
=
>
1
2
?
@
4
4
/
:
8
8
A
8
)
'
6
B
%
7
+
'
*
%
>
,
4
4
B
%
:
8
+
'
C
%
&
'
(
)
*
+
%
'
D
+
*
B
)
'
*
+
E
A
)
'
(
)
:
)
7
4
%
&
7
7
+
'
F
G
H
>
,
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS
COMPLETE UNIT.
Util Table
(Surface Fix Only)
Util Table
(surface fix only)
1. Install suitable foundation pads (see illustration) each with top face at ground level
2. Position table in correct orientation with bases centrally on foundation pads; then mark hole
positions through fixing lugs.
3. Remove the table; drill holes Ø12mm x 75mm deep (or as bolt manufacturer’s
recommendations).
4. Clear debris from holes.
5. Reposition table unit and fix to foundation pads using 4 no. zinc-coated M10 x 75mm sleeve
anchors tightened to 50Nm (or as per manufacturer’s instruction). Ensure table remains level
during fixing process. Finally hammer an anti-vandal armour ring over each bolt head to
prevent tampering.
6. Check level & re-instate ground level if necessary (sub-surface fix).
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on
stainless steel components.
4
UTIL TABLE installation