background image

355 (Ctrs)

1200 (Ctrs)

1200 (Ctrs)

355 (Ctrs)

5

0

0

Ground

Level

Foundation 2 no. pads

300 x 300 x 900mm in C20

concrete (recommendation only)

900

900

1200 (Ctrs)

1110 (Ctrs)

650 (Ctrs)

Ground

Level

Foundation 2 no. pads

300 x 300 x 900mm in C20

concrete (recommendation only)

355 (Ctrs)

1200 (Ctrs)

1200 (Ctrs)

355 (Ctrs)

900

900

5

45

 (

M

a

x)

3

85

 (

M

in)

650 (Ctrs)

1200 (Ctrs)

1110 (Ctrs)

Foundation -

300x300x900mm

concrete block

(recommended)

9

0

12

2 off M10 x 75mm

sleeve anchors (per

base) into Ø12 x 90mm

hole in foundation

Ground
Level

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT

Ribbon Twist Bench

Ribbon Flat Bench

Ribbon Twist Bench / Ribbon Flat Bench

1.  Install suitable foundation pads (see illustration) each with top face 
    at ground level

2. Position bench in correct orientation with bases centrally on 
    foundation pads; then mark hole positions through base plate

3. Remove the bench; drill holes Ø12mm x 90mm deep (or as bolt 
    manufacturer’s recommendations)

4. Clear debris from holes

5. Reposition bench unit and fix to foundation pads using 2 no. 
    zinc-coated M10 x 75mm sleeve anchors per base tightened to 
    50Nm (or as per manufacturer’s instruction). Ensure bench remains 
    level during fixing process

6. Check level and reinstate ground if necessary

IMPORTANT NOTE:

Ensure  that  stainless  steel  is  protected  during  site  cutting  of  stone  – 
contamination  from  disc  cutters  will  produce  corrosion  on  stainless 
steel components.

5

RIBBON installation

Reviews: