![background image](http://html1.mh-extra.com/html/factory-furniture/north/north_operation-and-maintenance-manual_3155979004.webp)
1400
7
3
5
4
3
5
500 (Ctrs)
1680 (Ctrs)
Foundation - 300x300x900mm
C20 concrete block (recommended)
FFL
3000
1480
120x12mm mild
steel galvanised
lower frame
500
(Ctrs)
8
0
M10 x 75mm sleeve
anchor into Ø12mm
hole in foundation
Foundation -
300x300x900mm
C20 concrete block
(recommended)
Ø12
FFL
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT
Table - Surface fix
North Picnic Table
1. Install suitable foundation pads (see illustration) each with top face at ground level.
2. Position table in correct orientation with bases centrally on foundation pads; mark hole positions through
frame.
3. Remove the table; drill holes Ø12mm x 75mm deep (or as bolt manufacturer’s recommendations).
4. Clear debris from holes.
5. Reposition table and fix to foundation pads using 4 no. zinc-coated M10 x 75mm sleeve anchors tightened to
50Nm (or as per manufacturer’s instruction). Ensure table remains level during fixing process.
4
NORTH PICNIC TABLE installation