Fig.9
Drive
locking screws through frame
holes into window sash (Fig.9/10)
5
To secure lower sash in place, attach right angle
sash lock with
screw as shown(Fig.11).
6
Fig.11
Cut foam seal and insert in the space between the
upper and lower sashes (Fig.12).
7
Fig.12
If AC is Blocked by Stor m W indow
Add wood as shown in Fig.13, or remove storm
window before air conditioner is installed.
If storm window frame must remain, be sure the
drain holes or slots are not caulked or painted shut.
Accumulated rain water or condensation must be
allowed to drain out.
Storm window
frame or other
obstruction
11/2 MIN
(38 mm)
,,
Sash
Board
thickness
as required,
for proper
pitch to rear,
along entire
sill. Fasten
with nails or
screws.
Fig.13
Removing AC From W indow
Turn AC off, and disconnect power cord.
Remove sash seal from between windows, and
unscrew safety lock.
Remove screws installed through frame and frame
lock.
Close (slide) side panels into frame.
Keeping a firm grip on air conditioner, raise sash
and carefully rock air conditioner backward to
drain any condensate water in base of unit. Be
carefully not to spill any remaining water while
lifting unit from window. Store parts WITH air
conditioner.
,,
, ,
Fig.10
3/4" (19 mm)
3/4" (19 mm)
10
Summary of Contents for MWK-05CMN1-BJ7
Page 14: ...WARRANTY 13...