![Faber Nova PRO NOPR30SSV Installation Instructions; Use And Care Information Download Page 11](http://html1.mh-extra.com/html/faber/nova-pro-nopr30ssv/nova-pro-nopr30ssv_installation-instructions-use-and-care-information_3768073011.webp)
11
Once the blower is in place re-install the
12 screws to fasten the motor to the Hood
body.
Reconnect the
Connectors to the
blower.
Fix the Supplied Cover with
3 screws 12e.
As shown in the image to the right
take the cable and cover removed
previously and place back in original
position and secure with the 2 screws
removed previously.
Caution: Do not damage
the Cable.
Summary of Contents for Nova PRO NOPR30SSV
Page 5: ...5 RANGEHOOD DIMENSIONS Min 24 Min 30 ...
Page 19: ...19 Wiring Diagram ...
Page 24: ...24 DIMENSIONS DE LA HOTTE Min 24 Min 30 ...
Page 38: ...38 Schéma de câblage ...
Page 43: ...43 DIMENSIONES DE LA CAMPANA Mín 24 Mín 30 ...
Page 57: ...57 Diagrama de cableado ...
Page 59: ...59 ...