background image

 

 

 

 

C E DECLARATION  OF  C O N F O R M I T Y

 

Manufacturer:

 

 

FAAC  S.p.A.

 

Address:

 

 

 

   

 

 

   

 

Via  Benini,  1

 

40069  - Zola  Predosa 
BOLOGNA  - ITALY

 

Declares that:

 

 

Token acceptorGRS-02

 

 

       

 

 

 

 

 

conforms to the essential safety requirements of the 

following EEC directives:

 

 

 

 

 

 

 

73/23 EEC and following modification 93/68/EEC

 

89/336 EEC and following modification 92/31 EEC and 
93/68/EEC

 

 

   

 

Additional notes:

 

this product underwent tests in a typical homogeneous 
configuration (all products by FAAC  S.p.A.).

 

 

 

 

 

                   

 

                     Bologna, 2

nd 

J a n u a r y   2009

 

 

 

 

 

 

 

 

 

The Managing 
      Director 

 

 

 

 

 

      A. Marcellan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for GRS-02

Page 1: ...orms to the essential safety requirements of the following EEC directives 73 23 EEC and following modification 93 68 EEC 89 336 EEC and following modification 92 31 EEC and 93 68 EEC Additional notes...

Page 2: ...gas or inflammable fumes is a serious danger to safety 8 FAAC is not responsible for failure to observe Good Technique in the installation of the product 9 Before attempting any job on the system cut...

Page 3: ...trian configuration the token insertion slot must be always open in this case the shutter must be physically removed In the vehicle configuration by interfacing a Single or a Two Channel Detector you...

Page 4: ...l if possible adequate means of protections against accidental impact Check that an efficient earth socket is available for connecting the housing of the Token Acceptor 4 2 POSITIONING THE COMPONENTS...

Page 5: ...laying the cable directly in a chase made in the existing pavement or this is the best solution realising a cable duct in PVC before the pavement is made In both cases the cable must be laid not over...

Page 6: ...nth as shown in fig 10 and wall the foundation plate supplying one or more sheaths for routing electrical cables Using a spirit level check if the plate is perfectly level Wait for the cement to set f...

Page 7: ...can be set on two levels according to the position of the loop connector Frequency depends furthermore on the loop shape on the number of windings and on the cable total length N B For any further ex...

Page 8: ...sence OFF OFF LOW ON OFF MEDIUM LOW OFF ON MEDIUM HIGH ON ON HIGH SW3 SW4 LOOP 2 SENSITIVITY transit OFF OFF LOW ON OFF MEDIUM LOW OFF ON MEDIUM HIGH ON ON HIGH Frequency selection The detector operat...

Page 9: ...E CONNECTION OF PHOTOCELLS AND SAFETY DEVICES REFER TO PARAGRAPH 4 1 BEAM BREAKTHROUGH BARRIER 620 640 SET IN LOGIC P OPEN CLOSED COMMANDS OPEN BARRIER CLOSED BARRIER LOOP 2 Safety stop command logic...

Page 10: ...C A OPEN CLOSED COMMANDS OPEN BARRIER OPEN COMMON CONTACT Safety stop command logic A on 624 BLD BARRIER PHOTOCELL MICROSWITCH ON GRS 02 ON N O CONTACT LOOP 2 MOTOR FAN MOTOR THRUST CAPACITOR BEAM BRE...

Reviews: