
Step 9: Mark the securing point for the pelmet box and the hole for the DC motor cable on the wall. Remember that the
hole for the cable is only needed on one side.
Step 10: Mark at least 3 fixing points on the shutter guide approx. 100 mm from the top and bottom and distribute the
holes approx. 400~500 mm apart making sure you do not place the holes where the mortar is.