background image

2

PACKING INCLUDES

Hardware

A - Canopy Frame (1pc)

B - Canopy Top With Sidewalls (1pc)

AA - Stake (10pcs)

BB - Spiral Stake (4pcs)

CC - Rope (4pcs)

Part List

Summary of Contents for 20JSEF00522

Page 1: ...Instruction Manual SKU 20JSEF00522 EzyFast Walk in Greenhouse 2x3m 6 5 x10 ...

Page 2: ...t cover normal wear and tear abuse or misuse of this product This warranty does not apply to damages caused by wind rain or other forces of nature nor to accidental or deliberated damage of the product nor to use of the product that does not conform with the product instructions including disregard of the safety and maintenance instructions It is your responsibility to read and save the instructio...

Page 3: ...2 PACKING INCLUDES Hardware A Canopy Frame 1pc B Canopy Top With Sidewalls 1pc AA Stake 10pcs BB Spiral Stake 4pcs CC Rope 4pcs Part List ...

Page 4: ...EN THE CANOPY FRAME Step 2 ATTACH THE CANOPY TOP Lift and partially pull the canopy frame apart Unfold the canopy top unzip the door and place on top of the canopy frame Avoid the peak cap hooking the lining of the canopy top Unzip ...

Page 5: ...ss the push button on each leg and raise or lower to adjust the canopy height SET UP THE CANOPY Step 3 Click From under the canopy use one hand to push the central bottom hub straight up until it clicks into the central pole LOCK THE FRAME ...

Page 6: ...5 SET UP THE CANOPY Step 5 VELCRO CONNECTION Secure the canopy top to the legs of the canopy frame using the Velcro connections Velcro Velcro ...

Page 7: ... of each canopy leg Insert stakes into the loops at bottom of sidewall Tie four ropes to the corners of the top fabric Measure out from the each leg to a proper distance and secure four stakes to the ground Tie the ropes to the stakes in the ground Ensure the rope has the proper tension by adjusting the plastic adjusters on the ropes ...

Page 8: ...ROLL UP THE DOOR PANEL Roll up the door panel when needed Secure with oval toggle 7 ...

Page 9: ... the legs to their original height Take off the PE top lift one corner of the frame until all legs are raised off the ground except for the 1 leg on the opposite corner Push inward until the frame is fully closed Get underneath the canopy Pull the lower roof hub down till the frame partially closed and unlocked ...

Page 10: ...Email service ezyfast net Code 20JSEF00522 V1 2021 www ezyfast net ...

Reviews: