Wall Bracing
HOG LEG
®
Installation
Charts
Warning: This manual should be used as a reference for bracing, but not for final design. Before
attempting to brace any wall, consult the latest edition of Standard Practice for Bracing Masonry Walls
Under Construction, OSHA, or a local licensed Professional Engineer. The data within this manual was
developed with the aid of professional engineers and is specifically developed for use with the Hog
Leg system. EZG Manufacturing makes no implications for use with other systems and complies with
the Standard Practice for Bracing Masonry Walls Under Construction under reference to C1.5 page 29.
Although many scenarios are listed, your conditions may vary. If at any time you need assistance,
please call EZ
G Manufacturing
at 800-417-9272.
Please note: the following charts references conditions that include but are not limited to:
Walls that are braced are reinforced masonry walls within the Intermediate Period of
construction. For bracing during the Initial Period, please reference the Standard Practice for
Bracing Masonry Walls Under Construction or contact a licensed Professional Engineer familiar
with local and national codes.
A maximum wind speed of 40mph (industry standard for life safety requirements)
A minimum of two (2) braces per 25 foot wall panel with properly installed braces placed at .2
times the
wall length from each end.
CMU with a minimum f’m=1500psi
Properly sized deadmen.
NOTE: EZG Manufacturing strongly recommends both low lift grouting as the wall is being laid up and embedded deadmen.